View Post

Recology Ostrom Case Study

New regulations from the California Water Board required that Recology Blossom Valley move their existing 60-acre windrow operation onto an impermeable surface.

View Post

Olympic Organics Case Study

Olympic Organics contacted us to automate the sampling and recording of temperature, reducing operational costs. Additionally, they wanted the system to be accessible remotely, so operators could have peace of mind while away from the facility.

View Post

Allwood Recyclers Case Study

Our team designed an 8-zone pipe at grade aeration system, that could be installed into the existing pad. To cut costs, GMT worked directly with the client to cut trenches in the concrete, lay the ducting, and repave the trenches.

View Post

Grimm’s Fuel Case Study

Grimm’s Fuel has been composting green waste from the Portland metropolitan area for over 30 years. The facility was using a static pile method, but as volumes grew and neighbors encroached